Construction of the bank headquarters with a public forum

Project

Since 2021, the Sächsische Aufbaubank (SAB) has been headquartered in the heart of Leipzig’s city center. The building comprises a four-story office wing, a ground floor containing a reception area, an auditorium, conference facilities, and a cafeteria, as well as an underground parking garage. The curved building encloses a public plaza in an L-shaped arrangement. The so-called Forum consists of a “forest” of columns and has been designed as an inner-city recreational area featuring planted islands, water features, and seating areas. The columns widen into mushroom-shaped canopies and serve as sunshades, enable smoke extraction from the parking garage, and provide drainage for the roof surfaces.

The five-storey building with its continuous roof projection and slender spun concrete columns defines a clear urban edge while creating a permeable transition to the Forum.

Structure
The primary structure was designed as a reinforced concrete frame system with four stabilizing cores, ensuring maximum flexibility for interior finishing and future adaptations. As the curved building geometry does not allow a regular structural grid, the floor layout was divided into two- and three-bay divisions with two outer rows of facade columns, which are set back approximately 80 cm from the facade, as well as centrally arranged core walls or columns. This results in span lengths for the reinforced concrete slabs ranging from about 5.0 m to 8.5 m. The continuous glazed curtain-wall façades (aluminium-PR facades) are suspended from the floor above and fixed at both the top and bottom to the structural floor slabs. The cantilevering roof is supported by external columns, which visually merge seamlessly into the forum area.

The column heads (canopies) of the 22 m high spun concrete columns, ranging from 2.5 to 5 m in diameter, consist of steel structures clad with a PTFE-coated glass fibre membrane.

Column Structure Forum
The forum is characterized by the distributed arrangement of slender, prestressed centrifugally cast concrete columns (wall thickness of 100 mm), approximately 22 m in length and with varying diameters. A distinction is made between primary and secondary columns: the primary columns (diameter = 700 mm) are arranged in a regular grid and are fixed at their base (slab above the basement level), whereas the secondary columns are pin supported. The column heads (canopies), whose diameters vary between 2.5 m and 5.0 m for architectural reasons, are rigidly connected to the columns. The canopies are interconnected by pinned connections, forming a roof diaphragm that is connected to the inner building structure as well as a perimeter beam that encloses the plaza. The canopies consist of a steel structure covered with fabric.

Project data

Client SAB - Sächsische Aufbaubank

Architect ACME

Finalization 2021

Project data Gross floor area 31.700 m²
Usable area 15.800 m²
Gross cubic capacity 120.000 m³
Span 20 m
Height 22 m

Services structural engineering, facade design