Refurbishment of the glass façades of eight multi-storey pedestrian bridges from 1996, with restoration of the steel structure
Project
At the Mercedes-Benz development center in Sindelfingen, several 1 to 4-storey glazed pedestrian bridges connect the building complexes. Each bridge level is divided by three rows of glass of equal height, one above the other. Parallel hinged windows are only arranged in the top row for ventilation. A special construction was developed without vertical mullions, just a transom system. The VGS glass was supplemented with a new type of dot film for bird protection. As part of the project, the coating of the bridge support structures was completely refurbished, welds repaired, crossings tightened and the roof covering renewed. The entire construction work was carried out without any restrictions on plant operations.
Structural and glass façade renovation of eight multi-storey building bridges
Fassade Design
Project data
Client Mercedes-Benz AG
Architect knippershelbig
Finalization 2024
Project data
Usable area 660 m²
Span 36 m (min. 12.50 m to max. 35.50 m)
Facade surface 4.000 m²
Services facade design